Bad Lauchstädt energy park
Shoring work was necessary for the construction of a new fire water tank and rainwater retention basin on the site of the planned Bad Lauchstädt energy park. The shoring was designed as a partially back-anchored, closed and sealed sheet pile wall box. These were temporary construction pit stabilisation measures. The excavation pits were built with 1490 square metres of closed, sealed sheet piling with 45 prestressed grouted piles with a total length of 540 m installed to tie back the sheet piling.