Renovation of Enzisweiler railway station

The renovation of Enzisweiler railway station included replacement of the platforms. A deep foundation was required due to the geological conditions. This was carried out using a customised special solution instead of the originally planned bored piles with micropiles. This special solution minimised the environmental impact and minimised the construction time.
A total of 368 micropiles with a total length of 3140 running metres were installed for the deep foundation of the platform.
The line crossing under the track was built using the jacking method. A cofferdam construction with 238m² of sheet piling and 75 running metres of threaded tie rods was used to build the start and finish pit.

Services performed by ANP-ES:
– Pretensioning the threaded tie rods
– Pile tests in accordance with DIN 14199 for tension and compression

Client:
DB Station & Service AG
Rosenheim station management
Südtiroler Pl.1
83022 Rosenheim
GERMANY

Planning:
GSGE GmbH
Gewerbe Str. 15
83355 Grabenstätt
GERMANY

Execution:
Franz Kassecker GmbH
Egerer Str. 36
95652 Waldsassen
GERMANY

Scroll to Top